Hospitality

Equipment Operation Logs | Machine Tracking App | ChkPoints

Machine and equipment operation tracking workflow. Operators scan asset tags at startup, log operating parameters and output, record any faults or safety stops, and complete a shutdown checklist — creating a documented operation record for every run.

How It Works

🔧 Machine Startup\nScan asset tag · Pre-op checks

⚙️ Operation Log\nJob reference · Units processed

⚠️ Issues Encountered\nFaults · Safety stops · Maintenance

🏭 Shutdown\nOperating hours · Condition check

Checkpoints

1

Machine Startup

  • Operator name
  • Machine asset tag (barcode scan)
  • Machine description
  • Pre-op checks completed (Y/N)
  • Pre-op notes
  • Startup time
2

Operation Log

  • Job / order reference
  • Operating parameters / settings
  • Units processed
  • Quality within spec (Y/N)
  • Quality notes
3

Issues Encountered

  • Fault observed (Y/N)
  • Fault description
  • Stopped for safety (Y/N)
  • Maintenance required (Y/N)
  • Maintenance notes
4

Shutdown

  • Total operating hours
  • Shutdown checklist completed (Y/N)
  • Machine condition
  • Shutdown time
  • Post-op notes

Who Uses This?

Manufacturing plants, food processing facilities, mining operations, and facilities teams requiring documented equipment operation records for maintenance scheduling, operator accountability, and compliance.

Try It in ChkPoints Designer

Fields Reference

Checkpoint Field Type Description
Machine Startup Operator Name text Operator name
Machine Startup Machine Asset Tag barcode Scan asset tag
Machine Startup Machine Description text Machine description
Machine Startup Pre-Op Checks Completed yes/no Pre-op done
Machine Startup Pre-Op Notes text Pre-op notes
Machine Startup Startup Time time Start time

Checkpoint Field Type Description
Operation Log Job / Order Reference text Job/order ID
Operation Log Operating Parameters text Settings/parameters
Operation Log Units Processed number Output count
Operation Log Quality Within Spec yes/no Within spec
Operation Log Quality Notes text Quality notes

Checkpoint Field Type Description
Issues Encountered Fault Observed yes/no Fault present
Issues Encountered Fault Description text Fault details
Issues Encountered Stopped for Safety yes/no Emergency stop
Issues Encountered Maintenance Required yes/no Maintenance needed
Issues Encountered Maintenance Notes text Maintenance details

Checkpoint Field Type Description
Shutdown Total Operating Hours number Total hours run
Shutdown Shutdown Checklist Completed yes/no Shutdown done
Shutdown Machine Condition text Final condition
Shutdown Shutdown Time time Shutdown time
Shutdown Post-Op Notes text Post-op notes

Get in Touch

Ready to transform your business? Contact Ocom today for a free consultation.

Contact Form

Tell us about your project and we'll respond within 24 business hours.

Please provide your first name.
Please provide your surname.
Please provide a valid email address.
Please provide your company name.
Please provide some details.
You must agree before submitting.

Your information is secure and will never be shared. We typically respond within 24 business hours.

Contact Information

Phone Consultation

Schedule a free consultation

Call Now
Mon–Fri: 9am–5pm AEST
Email

Send us your project details

Send Email
Response within 24 hours
Office

Suite 3 Level 1
80 Pakington Street
Geelong West 3218 VIC

Get Directions

Why Choose Ocom?

15+ Years Experience
Proven track record
24-Hour Response
Quick turnaround
Free Consultation
No obligation
Satisfied Clients
Proven results